Automate, yes, but what? A method for choosing the first 5 use cases
Not every repetitive task deserves to be automated. Here is a simple method for identifying the ones that deliver the most for the effort required.
Start with the tasks, not the technology
Many projects start with a technical question: which model, which tool? The right question is simpler. Which tasks come back every week, take time and follow fairly clear rules? AI becomes especially useful when the inputs are varied texts or documents. For the rest, rules and conventional integrations are often enough.
Step 1: map
With each department, list the repetitive tasks. Ask the people who do them, not just their managers. Look for tasks that handle documents (correspondence, invoices, files, reports), that recur at regular intervals and whose expected result can be checked.
Step 2: estimate the gain
For each case, estimate the monthly gain with a simple formula:
- Automatable hours in the department: how many hours per month per staff member are spent on this type of task?
- Share of the case: what fraction of those hours relates to this specific case?
- Automation rate: what share of the work does the tool actually take on, review included? Rarely 100%.
Step 3: estimate the effort
Rate the implementation effort on a short scale: 1 (low), 2 (medium), 3 (high). It depends on access to the data, the number of systems to connect, the business validation required and the sensitivity of the data.
Step 4: prioritise
The priority score is the gain divided by the effort. You can also place the cases in a matrix:
- Quick wins: high gain, low or medium effort. Start here.
- Major projects: high gain, high effort. To be planned.
- Bonus: moderate gain, low or medium effort. To take up when the opportunity arises.
- Set aside for now: moderate gain, high effort.
A worked example, with indicative assumptions
Take the mail and reception department of a local authority, set to level 3 in our audit tool, i.e. 10 automatable hours per month per staff member. The assumptions below are orders of magnitude written to illustrate the method. They do not come from measurements.
- Sorting and routing incoming mail: 10 h × 50% × 50% = 2.5 hours per month per staff member. Effort 1, score 2.5.
- Standard replies to public enquiries: 10 h × 50% × 40% = 2.0 hours. Effort 2, score 1.0.
The first case comes before the second: the gain is similar, but the effort is half as much. In a real audit, these values are replaced with measurements.
Sensitive data
Correspondence, HR files, contracts: some cases handle confidential data. Note this from the mapping stage. For these cases, we recommend a sovereign architecture, with open models and processing within a perimeter you control.
Common pitfalls
- Automating a poorly thought-out process. It is better to simplify it first.
- Ignoring review time, which reduces the real gain.
- Confusing hours freed up with jobs cut. A gain in hours is not a cash saving until the time is reallocated.
- Measuring nothing beforehand. Without a baseline, there is no way to prove the gain afterwards.
Next: a pilot
Choose one or two quick wins, test them for a few weeks with a small group, compare against the measured baseline, then decide whether or not to expand. It is slower to decide than a large programme, but far more reliable.
Run the audit in a few minutes
Choose a sector, set the intensity by department, and get the 5 cases to look at first. No data is sent.
Further reading
The ROI of an AI project: why you should not add up budget, time freed up and risk avoided
A single ROI figure often mixes three different realities. Separating them makes the decision more honest.
Read the article →RAG explained: how an AI answers from your documents and cites its sources
An AI model does not know your documents. The RAG technique lets it answer from them, and cite its sources.
Read the article →Preparing an AI project?
Tell us about your use case: we will tell you whether it justifies a pilot.