ROI simulator
Keep budget, capacity freed up and risk avoided apart. An honest decision starts by not adding them together without saying so.
1. Capacity freed up
2. Budget
3. Risk avoided (optional)
Results
Estimate based on the values entered. The default values are examples, to be replaced with your own.
Capacity freed up
Budget view (cash only)
Broad view (budget + capacity + risk)
The calculations run in your browser. Nothing is sent to our servers.
Cumulative by year (broad view)
| Period | Budget flow | Broad view flow | Broad view cumulative |
|---|
Reading the results
Why three separate dimensions.
The budget view only counts money that goes out or no longer goes out. Capacity freed up is a real value, but it only becomes cash if the time is reallocated or if recruitment is avoided. Risk avoided is an expected value, not a receipt.
With the default values, the budget view alone does not recover the investment within the horizon: this is intentional, to show that the decision rests on the value of the time freed up.
Formulas
Value of time = net hours × hourly cost
Risk avoided = cost of the incident × probability × reduction
Budget flow = savings - operating costs
Broad flow = budget flow + value of time + risk avoided
NPV = -investment + sum of flows ÷ (1 + rate)year
Payback (months) = investment ÷ (annual flow ÷ 12)
“Immediate”: no investment, or payback in less than a month. “Never”: annual flow negative or zero.
“Beyond the horizon”: payback occurs after the end of the simulated period.
One full-time equivalent = 1,600 hours per year
Frequently asked questions
Why subtract review time?
An AI answer has to be checked. Ignoring this time overestimates the gain.
What if I do not know the risk avoided?
Leave 0. A cautious result is better than an invented figure.
Is the value of time freed up money?
Not automatically. That is why the budget view and the broad view are shown side by side.
A costing based on your data.
We replace the examples with measurements and a quote.